|
|
|
Summer 07: The pylons are planted 50+ ft. into the ground.
|
|
|
|
Holes over the pylons on the floor repoured.
|
|
|
|
The floor resealed and ready for carpet.
|
|
|
|
Orchestra stuff stored in the back of the band room. Thanks, Mr. Stenzel!
|
|
|
|
|
2 Jan 2009 - The orchestra room upon my arrival to school.
|
|
|
|
I moved all of this stuff from the room to the hallway so we could have class for the first time in 9 months in the orchestra room.
|
|
|
|
Mr. Stenzel helped.
|
|
|
|
It was back breaking.
|
|
|